- Country: USA
- Summary: Troy Lock (AFO) Mooring Pier
- KWT Ref No: 111094229
- Deadline: 16 Jan 2025
- Competition: ICB
- Financier: Self Financed
- Purchaser Ownership: Public
- Tender Value: Refer Document
- Notice Type: Tender
- Document Ref. No.: W912DS25B0001
- Purchaser's Detail :
Purchaser : DEPT OF DEFENSE | DEPT OF THE ARMY
KO CONTRACTING DIVISION 26 FEDERAL PLAZA ROOM 16 300, NEW YORK , NY 10278-0004, USA
Primary Point of Contact: Denisse M. Soto, denisse.m.soto@usace.army.mil, Phone Number 9177908177
Secondary Point of Contact: Mohenda R. Surage, mohenda.r.sur...
Email :denisse.m.soto@usace.army.mil
- Description :
- Description
Advanced Notice for the Repair of the Vessel Mooring Structure at the USACE Albany Field Office, Troy Lock & Dam located in Troy, NY:
U.S. Army Engineer District, New York, CENAN-CT, 26 Federal Plaza, New York, NY 10278-0090. The U.S. Army Corps of Engineers, New York District intends to issue a solicitation package seeking to award a Firm-Fixed Price contract for the Repair of the Vessel Mooring Structure at the USACE Albany Field Office, Troy Lock & Dam located in Troy, NY. This project will be solicited as a Small Business set -aside via an Invitation for Bid (IFB)/Firm Fixed Price contract.
Project Description:
The mooring structure is located downstream of Troy Lock & Dam on the Hudson River. The mooring structure is currently used by public and private ships when preparing to enter and exit the lock. The mooring structure, constructed in 1968, is a diaphragm type cellular structure. It consists of seventeen steel ½ inch sheet pile cellular filled with crushed stone and covered by a concrete deck. The mooring structure has a timber fender system consisting of seven rows of oak rubbing strips that are fastened along the entire length of the structure. There are nine cast iron snubbing posts and eight ladders.
The repair project includes the following elements:
Replace timber rubbing fenders with composite material fendering system. Replace fendering system supports and tie plates. Repair damaged ladders and metal grating. Removal and Replacement eight of seventeen concrete decks which have settled within the sheet piles. Repair leaks along cell walls and fill voids. Clear vegetation growing on the concrete decks of the structure, trim tree branches directly above the structure to include removal of one tree.
There will be no land access to this vessel mooring structure, all work shall be performed via water access only.
The mooring structure is located adjacent to the City of Troy-s public boat la...
- Documents :
Tender Notice
RTA-Submission-Plans-Mooring-Pier-Signed-24.pdf
RTA-Submission-DA-APP-B-Structural-Observation.pdf
TROYMOORINGPIER_RTA_SPEC_11-15-2024-FINAL.pdf
RTA-Submission-Design-Analysis-Mooring-Pier-24.pdf
RTA-Submission-DA-APP-A-Structural-Design-Calc.pdf
W912DS25B0001.pdf